摘要 |
The procedure relates to the erection of buildings, or parts of buildings. To achieve this the procedure entails erecting repetitive filigree structures with precast concrete parts. The precast concrete parts are produced by concrete mixing plants which may be located at building sites and/or in the vicinity of building sites, and are connected joint-free in a battery rotational shuttering process. Independent claims are also included for: (a) an actuator arrangement with a support for an element to be vertically aligned; (b) a prefabricated concrete element for a high rack store; (c) a support for roof constructions; (d) a high rack store; (e) and a fire wall for a high rack store.
|