摘要 |
The invention relates to a method for establishing a foundation for a buildi ng comprising several segments, in particular for a tower (2) of a wind energy plant, a foundation segment for use in such a method and wind energy plant. According to the invention, a stable foundation may be achieved whereby a method with the following method steps is disclosed: excavating a foundation bed (13), production of a stable essentially flat and horizontal-running granular sub-base (12) in the foundation bed (13), placement of a foundation segment (4) of the building on the granular sub-base (12), whereby at least three height-adjustable support rods (11, 21) are fixed to the foundation segment (4), by means of support feet (110) on the end of each support rod (11, 21), such that only the support rods (11, 21) are placed on given suppo rt points (14) of the granular sub-base (12), production of reinforcing on the granular sub-base and casting what remains of the foundation bed with foundation masses, in particular, concrete up to above the lower edge of the foundation segment (4). |