摘要 |
<p>PROBLEM TO BE SOLVED: To support a planning for water working in the emergency case such as the trouble of a waterworks water-distribution system. SOLUTION: A working plan in the emergency case is planned by a computer, an external storage device and a display input device, and a working-plan generating section computing the change of a water-distribution path and a working crew with the change and a water-wagon arranging plan section computing the quantity of water demand in a water-supply suspension region generated by the change of the path and generating a water-wagon arranging plan are mounted on the computer. A monitor control DB for a facility and a distributing pipe line, a facility DB, the crew DB required for the change of the facility, geographical information DB, a water-wagon arranging spot DB, a water-meter inspection block DB and a water wagon DB are secured to the external storage device. A working plan in which the places of the suspension of water supply are reduced can be generated in the case of the trouble of the water-distribution system and a water wagon can be arranged properly in a water-supply suspension region.</p> |