摘要 |
The invention relates to a method of surveying a geological formation through which a cased borehole passes, said method being characterized by the fact that:in a first step, current is injected into the casing (11) at a first point (In1) spaced apart longitudinally from said formation so as to cause current to leak into said formation, and electrodes (a, b, c) defining two consecutive sections of casing situated at the level of said formation ,ire used to measure the respective potential drops along said sections;in a second step, current is injected into the casing at a second point (In2) spaced apart longitudinally from the formation and situated on the opposite side thereof from said first point, so as to cause current to leak into the formation, and said electrodes are used to measure the potential drops along said sections;the corresponding measurements of the two steps are combined to obtain the values corresponding to a circuit formed by the casing between the two injection points is and essentially exempt from leakage into the formation; andthe current leakage that is indicative of the resistivity of the formation is determined on the basis of the measurements taken in the first step and in the second step, and of the values resulting from said combination.
|