发明名称 |
TENSILE STRESS REDUCTION METHOD WHEN CONSTRUCTING DOUBLE-T BRIDGE BY MOVABLE SCAFFOLDING SYSTEM |
摘要 |
PURPOSE: A tensile stress reduction method when constructing a double-T bridge by a movable scaffolding system is provided to keep the optimum stress by reducing tensile stress on a support. CONSTITUTION: The tensile stress reduction method when constructing a double-T bridge by a movable scaffolding system comprises the steps of: after installing a form of a movable scaffolding system on a primary span, placing concrete; stripping inner and outer forms of the movable scaffolding system; placing temporary prestress on the inside of a support; placing prestress on a web; moving the form of the movable scaffolding system to a secondary span, then repeating the progresses for a primary span to complete the construction works on the secondary span; and dismantling temporary prestress on the primary span when constructing for a third span.
|
申请公布号 |
KR20030027261(A) |
申请公布日期 |
2003.04.07 |
申请号 |
KR20010060381 |
申请日期 |
2001.09.28 |
申请人 |
KOREA HIGHWAY CORP.;VSL KOREA CO., LTD. |
发明人 |
LEE, DAE U;LEE, HYEON SEUNG;LEE, MAN SEOP;PARK, SANG IL;PARK, YEONG JIN |
分类号 |
E01D2/00;(IPC1-7):E01D2/00 |
主分类号 |
E01D2/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|