发明名称 |
Gas turbine and operation method of gas turbine combined electric generating plant, gas turbine combined electric generating plant, and computer product |
摘要 |
A casing air temperature Ta and a steam temperature Ts are measured, and if an absolute value DELTAT of a difference between these two temperatures is within a predetermined temperature, the gas turbine is connected to the generator. After the connection is done, the load is gradually increased, and the coolant changeover signal is sent from a processor to a controller. The coolant is then changed to the steam, thereby completing the connection of the gas turbine with the generator and the changeover of the coolant.
|
申请公布号 |
US2003065436(A1) |
申请公布日期 |
2003.04.03 |
申请号 |
US20020242767 |
申请日期 |
2002.09.13 |
申请人 |
HYAKUTAKE YOSHINORI;FUJITA YASUHIRO |
发明人 |
HYAKUTAKE YOSHINORI;FUJITA YASUHIRO |
分类号 |
F01D19/00;F01D19/02;F01D25/12;F01D25/14;F01D25/26;F01K23/10;F02C7/16;F02C7/18;(IPC1-7):F02C9/00 |
主分类号 |
F01D19/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|