摘要 |
PROBLEM TO BE SOLVED: To provide a steel pipe pile executable even to the hard gravel ground and the ground including debris. SOLUTION: This steel pipe pile is characterized by being constituted by having a vertical claw 5 suspended from an under surface of a spiral blade 2 in a starting end part of the spiral blade 2 arranged on the tip of the steel pipe pile 1. |