摘要 |
PROBLEM TO BE SOLVED: To provide a pile-fence construction method of a slope face of a slope capable of making the most of an advantage of the pile-fence construction method, and capable of enhancing durability. SOLUTION: This pile-fence construction method protects the slope face by partitioning the slope face 21 of the slope 20 by a fence 23, and includes driving at least two artificial piles 24 at an interval in the frontage direction of the slope face, installing fixtures 25 on the respective artificial piles before or after driving the artificial piles, installing the artificial fence 23 by using the respective fixtures, and inputting and supporting an infilling material 40 in the slope face by the artificial fence.
|