摘要 |
PROBLEM TO BE SOLVED: To provide a beam main reinforcement unit pre-fabricating device that can reduce the required area of a pre-fabrication yard by simplifying the handling operation of reinforcements constituting a beam reinforcement unit including a U-type anchor main reinforcement while being able to cope with all the drawn-out beam reinforcement units. SOLUTION: This beam main reinforcement unit pre-fabricating device installed in proximity to the site of a building is composed of a long-sized side main reinforcement build-up frame 1 that can transport a straight reinforcement or the U-type anchor main reinforcement on both sides, short-sized side main reinforcement build-up frames 2, 3 arranged orthogonally on both sides of the long-sized side main reinforcement build-up frame 1, and main reinforcement placing places 4, 5 arranged along the respective erection frames.
|