发明名称 MANHOLE FRAME AND CONSTRUCTION METHOD THEREOF
摘要 PROBLEM TO BE SOLVED: To solve the problem in the set of a manhole frame above a manhole structure buried in ground that the work of selecting a support block to be set between the both most suitable to a construction site from various kinds of support blocks differed in inclination degree or thickness is required, and this work is extremely troublesome. SOLUTION: A cushioning material 10 corresponding to the support block is mounted on the reverse side of a manhole frame 1 from the beginning. In construction, level adjustment is performed by wet method using mortar. Since the work of selecting the most suitable one from various kinds of support blocks is not included, the manhole frame 1 can be easily and quickly set.
申请公布号 JP2003055997(A) 申请公布日期 2003.02.26
申请号 JP20010249540 申请日期 2001.08.20
申请人 ITO YOGYO CO LTD 发明人 ONISHI KAZUMASA;MIYAMA HIROAKI
分类号 E02D29/14;E02D29/12;(IPC1-7):E02D29/14 主分类号 E02D29/14
代理机构 代理人
主权项
地址