摘要 |
In a film camera production method, a leading portion of a filmstrip is draped across a midsection of a camera frame. The camera frame has a film roll chamber joined to the midsection. A free end of the leading portion is lodged in the film roll chamber and a retention zone of the filmstrip is placed in engagement with a retention structure mounted to the frame. The retention zone adjoins the free end. The retention structure is fixed in position on the frame. The engagement of the retention zone and retention structure locks the leading portion against longitudinal travel toward the film roll chamber. The frame is transported and, during the transporting, the engagement of the retention zone and retention structure is maintained. Following the transporting, the retention zone is pulled off the retention structure.
|