摘要 |
PROBLEM TO BE SOLVED: To provide a communication cable which can prevent deformation or damages as much as possible of unit wires due to bending, side pressure or the like. SOLUTION: A cushioning material 40, such as PP fibrillated film yarn, is interposed between a tension member 23 and unit wires 5 arranged around the tension member 23 so as to fill the gap.
|