发明名称 AUTOMATIC EXECUTION SCHEDULE PREPARING SYSTEM
摘要 PROBLEM TO BE SOLVED: To provide an automatic execution schedule preparing system that can select trustable constructors by shifting other processes within a shiftable time range by defining the day's programs of the other processes in order from the process having the minimum degree of surplus power and can automatically and reasonably adjust the day's programs of all processes by means of a computer. SOLUTION: A plurality of processes (in this embodiment, first and second processes) contained in objective construction work are respectively allotted to time ranges which can be shifted by the amount of arbitrary surplus days. Then the process for which the number of trustable constructors is the minimum and which has the minimum degree of surplus power is detected by referring to data (b)-(d) indicting the schedules of the constructors entrusted for the processes. The day's program of the process in which the entrusted constructor has little spare time in its schedule is decided most preferentially. Thereafter, the day's programs of the other processes are defined in order from the process having the minimum degree of surplus power.
申请公布号 JP2003027743(A) 申请公布日期 2003.01.29
申请号 JP20010216222 申请日期 2001.07.17
申请人 SUMITOMO FORESTRY CO LTD;SUMITOMO RINGYO SYSTEM JUTAKU KOGYO KK 发明人 IWASAKI HIROSHI
分类号 E04G21/00;G06Q10/00;G06Q10/06;G06Q50/00;G06Q50/08 主分类号 E04G21/00
代理机构 代理人
主权项
地址