发明名称 OVERLAY METHOD, CUT-OVERLAY METHOD, AND PAVING METHOD
摘要 PROBLEM TO BE SOLVED: To provide an overlay method including bulk adjustment and setting of a manhole frame. SOLUTION: The overlay method for pavement including the manhole frame consists of the following steps (a), (b), (c), and (d). In the step (a), a surface of a manhole cover 2 is coated with a release agent 3, and an overlay 5 is laid on a surface of the pavement 4 and a surface of the release agent 3. In the step (b), the manhole frame 1 is pulled out by a lifter 12, and a pavement portion 7 around the manhole frame 1 is removed. In the step (c), a holding frame 13 is fixed onto an upper surface of the manhole frame 1 to suspend the manhole frame 1 over a manhole base wall 6, and a gap between the manhole frame 1 and the manhole base wall 6 is filled with an inner frame. In the step (d), foundation concrete is cast in situ into a portion of a cavity around the manhole frame 1, corresponding to a height between an upper surface of the manhole base wall 6 and a lower surface of the manhole frame 1, and thereafter a pavement material is placed over the foundation concrete up to the height of the surface of the overlay 5.
申请公布号 JP2003027413(A) 申请公布日期 2003.01.29
申请号 JP20010217137 申请日期 2001.07.17
申请人 ITO YOGYO CO LTD 发明人 MIYAMA HIROAKI;KAMISHIRO TAKEO
分类号 E02D29/12;E01C23/09;(IPC1-7):E01C23/09 主分类号 E02D29/12
代理机构 代理人
主权项
地址