摘要 |
PROBLEM TO BE SOLVED: To construct a reinforced concrete structural basement for connecting a prefabricated house via a first floor base rising part formed in the upper part of an underground wall of the basement, an underground garage or the like. SOLUTION: In this structure for the basement A or the underground garage B constructed in the underground part of the prefabricated house, a reinforcement 15 is arranged thoroughly from the upper part of the underground wall 3 to the rising part 7, and concrete 16 is placed continuously from the underground wall 3 to the first floor slab 2 and the rising part 7.
|