摘要 |
<p>Determination of the rate penetration (ROP) of drilling has usually been based upon surface measurements and may not be an accurate representation of the actual ROP. This can cause problems in Logging While Drilling (LWD). Because of the lack of a high-speed surface to-downhole communication while drilling, a conventional method of measuring ROP at the surface does not provide a solution to this problem. However, the instantaneous ROP can be derived downhole with a certain degree of accuracy by utilizing an accelerometer placed in (or near) the tool to measure acceleration in the axial direction. When three-component accelerometers are used, the method may be used to determine the true vertical depth of the borehole.</p> |