摘要 |
<p>A method of reinforcing an offshore installation (1), preferably a platform deck, when one or more of the natural support point(s)/lifting point(s) (2) of the installation is (are) missing in connection with mounting/disassembling and transport of the installation (1), and the removal of one or more of the natural support points (2) for the installation is compensated for by transfer of forces which are effective in the absent support points (2) to the other support points/lifting points (3,4). The forces from the lacking support points (2) are transferred to the other support points (3,4) by means of pre-tensioning cables (5) which are cast into concrete and are tensioned after the curing of the concrete.</p> |