发明名称 STEEL TOWER CONSTRUCTING CRANE AND STEEL TOWER CONSTRUCTION METHOD USING CRANE
摘要 PROBLEM TO BE SOLVED: To safely construct a comparatively small steel tower in a narrow place of streets or a mountain district. SOLUTION: A base mast 12 is disposed on the side of a steel tower 1 in the process of construction, the base mast 12 is supported on the steel tower 1 using a first mast holder 35, and the middle part of a mast 21 elongated upward from the base mast 12 is supported on the steel tower 1 using second mast holders 51, 51. Thus, the steel tower 1 in the process of construction and a crane 11 mutually complement the strength to rocking, whereby even if the space for disposing the mast 21 inside the steel tower 1 can't be secured, the steel tower 1 can be safely constructed using the crane 11 disposed on the side of the steel tower 1.
申请公布号 JP2002356297(A) 申请公布日期 2002.12.10
申请号 JP20010165364 申请日期 2001.05.31
申请人 KYOWA EXEO CORP;HITACHI CONSTR MACH CO LTD 发明人 TAKAYABU YOSHIMICHI;YABE KAZUNORI;KURIYAMA WATARU;TAKEDA MITSURU;SHOJI ISAMU
分类号 E04H12/10;B66C15/00;B66C23/28;B66C23/32;(IPC1-7):B66C23/28 主分类号 E04H12/10
代理机构 代理人
主权项
地址