发明名称 SYNCHRONIZATION OF AT LEAST ONE NODE OF A BUS SYSTEM
摘要 The invention relates to a method for synchronizing at least one node of a bus system, which is operated with a predeterminable system clock period (NTU), whereby a local clock period (LNTU) and a reference clock period (GNTU) are given for the at least one node, and the reference clock period (GNTU) is synchronized with the system clock period (NTU). A local clock period (SLNTU), which is synchronized with the system clock period (NTU), of the at least one node is produced whereby linking the local clock period (LNTU) with a splitting factor (P), whereby the splitting factor (P) represents a ratio of the reference clock period (GNTU) to the local clock period (LNTU). The splitting factor (P) for synchronizing the local clock period (LNTU) with the system clock period (NTU) is adapted by adding or subtracting a adaptation value (O).
申请公布号 WO02076031(A3) 申请公布日期 2002.12.05
申请号 WO2002DE00872 申请日期 2002.03.13
申请人 ROBERT BOSCH GMBH;FUEHRER, THOMAS;MUELLER, BERND;HARTWICH, FLORIAN;HUGEL, ROBERT 发明人 FUEHRER, THOMAS;MUELLER, BERND;HARTWICH, FLORIAN;HUGEL, ROBERT
分类号 H04L7/00;G06F1/08;G06F1/12;H04J3/06;H04L12/403;H04Q11/04 主分类号 H04L7/00
代理机构 代理人
主权项
地址