摘要 |
Three-dimensional large scale bodies such as jumbo aircraft fuselages (14) are assembled in body sections around a central longitudinal assembly core (1) which itself is mounted at its ends and accessible all around along its length. Robots carrying tools for holding, transporting and precisely positioning pre-assembled wall shell sections, are movable along the central core (1). First, at least one floor grid (2 or 3) is releasably mounted to the core. Then, side wall shell sections (4, 5) are secured to the floor grids. Then, top and bottom wall shell sections (10, 8) are secured to the side wall shell sections (4, 5) to form a body section (BS) of the large scale body (14). Neighboring body sections are secured to each other along cross-seams. Upon completion, the floor grids are released from the core (1) and the core is removed preferably withdrawn longitudinally from the assembled large component or body.
|