发明名称 CUT-OFF METHOD FOR LATERAL PORT OF BURIED MAIN PIPE
摘要 <p>PROBLEM TO BE SOLVED: To provide a cut-off method for a lateral port cutting off the lateral port for a buried main pipe from a water, by fully securing a drawing distance of the tip of a rehabilitation pipe and capable of shortening the working time and simplifying the rehabilitation works. SOLUTION: A tip tool 53 of the rehabilitation pipe is locked to a wire 54, which is lead from a buried main counter-side into the inside of the lateral 4, while being guided by a guide roller 61 fitted to the lateral port 31 of the buried main 3 and pulls the wire, so as to draw the rehabilitation pipe till it abuts against the guide roller. The guide roller is moved to a side of a downstream side manhole Q2 of the buried main with the wire, the rehabilitation pipe is further drawn by the moving distance of the guide roller so as to secure drawing allowance of the rehabilitation pipe, the rehabilitation pipe is heated by introducing steam inside the rehabilitation pipe, and then the rehabilitation pipe is pressurized and inflated, so as to be closely lined to the inside of the lateral. The drawing allowance of the rehabilitation pipe is turned up and is stuck tightly to the circumference of the lateral port of the buried main, to cut off the lateral port from water.</p>
申请公布号 JP2002323173(A) 申请公布日期 2002.11.08
申请号 JP20010124774 申请日期 2001.04.23
申请人 SEKISUI CHEM CO LTD 发明人 NAKAGAWA HIROHIDE;SUGAWARA HIROSHI;WATANABE MICHIHIKO;TAKANO YUKIHIRO
分类号 E03F7/00;F16L1/024;(IPC1-7):F16L1/024 主分类号 E03F7/00
代理机构 代理人
主权项
地址