发明名称 CYCLE ARRANGEMENT OF STEAM-TURBINE UNIT
摘要 thermal engineering; designing new and updating existing steam- turbine installations. SUBSTANCE: cycle scheme of steam-turbine unit is set up of boiler coupled through steam line with turbine incorporating regenerative heaters and condenser and second boiler coupled through steam line with second turbine including regenerative system and delivery water boiler. Delivery-water line running to second-turbine boiler is connected through pipeline to first-turbine condenser and delivery-water outlet line running from second-turbine boiler is coupled through pipeline condensate supply line to first- turbine regenerative heaters. EFFECT: enlarged functional capabilities; provision for round-the-year continuous operation of existing equipment with high economic efficiency. 1 cl, 1 dwg
申请公布号 RU2189455(C1) 申请公布日期 2002.09.20
申请号 RU20010130975 申请日期 2001.11.13
申请人 SHARGORODSKIJ VIKTOR SEMENOVICH;BOZHKO VIKTOR VLADIMIROVICH 发明人 SHARGORODSKIJ V.S.;BOZHKO V.V.
分类号 F01K13/00;(IPC1-7):F01K13/00 主分类号 F01K13/00
代理机构 代理人
主权项
地址