发明名称 CONSTRUCTION EQUIPMENT
摘要 PROBLEM TO BE SOLVED: To organically and totally improve functions of construction equipment relating to the cleaning of a cooling device, the reduction of temperature rise of an engine room, the reduction of the leakage of the noise and the miniaturization by installing the engine room accommodating an engine through a partitioning member in the engine room installed at an interval in the cooling device loaded on the construction equipment. SOLUTION: The cooling device R is installed by superposing cooling devices arranged in parallel and other cooling devices arranged in parallel, an opening 50 is made on an engine front cover C1 of the engine room 12 installed at an interval from the cooling device R and accommodating the engine 22, for circulating cooling air, the partitioning member 60 is installed for guiding cooling air coming from a cooling fan 20 of the cooling device R through the opening 50 to change its direction to the outer peripheral direction of the partitioning member 60, and providing a cooling air passage CD between the engine cover C1 composing the engine room 12 and the outer periphery of the partitioning member 60, and the engine room 12 and the engine 22 are cooled by the cooling air from the engine front cover C1.
申请公布号 JP2002254935(A) 申请公布日期 2002.09.11
申请号 JP20010059000 申请日期 2001.03.02
申请人 SHIN CATERPILLAR MITSUBISHI LTD 发明人 IZUMI HIDEYUKI
分类号 B60K11/04;F01P3/18;F01P5/06;F01P11/10;F01P11/12;(IPC1-7):B60K11/04 主分类号 B60K11/04
代理机构 代理人
主权项
地址