发明名称 FORM UNIT FOR BUILDING FOUNDATION, METHOD FOR EXECUTING BUILDING FOUNDATION AND BUILDING FOUNDATION
摘要 PROBLEM TO BE SOLVED: To solve the problem that the considerable section of floor concrete must be destroyed, construction works are conducted on a large scale and the term of works is also lengthened when replacement, exchange or removal of a distributing pipe or the like in the case of maintenance and the extension and alteration of a building or the like with time is required because a drain pipe installed while being penetrated to a continuous footing is unified with floor concrete in a building foundation executed in a conventional execution method. SOLUTION: Since a pit section 40 is mounted adjacent to the continuous footing 4 and the drain pipe 60 is laid by utilizing the inside of the pit section 40, the replacement, exchange or removal of the drain pipe 60 can be conducted easily in a short period in the case of maintenance, the extension and alteration of the building or the like with time.
申请公布号 JP2002227410(A) 申请公布日期 2002.08.14
申请号 JP20010019236 申请日期 2001.01.26
申请人 SANYO HOMES KK;KUBOTA CORP 发明人 KON YOSHIAKI;INOUE SHUICHI
分类号 E02D27/01;E04G11/06;E04G17/14;(IPC1-7):E04G17/14 主分类号 E02D27/01
代理机构 代理人
主权项
地址