发明名称 SUBGRADE AND TRAFFIC PATH INCLUDING THE SAME
摘要 PROBLEM TO BE SOLVED: To effectively utilize cut trees or the like disposed in the past by including wooden pieces obtained by crushing the cut trees or the like in a thick subgrade. SOLUTION: Soil, wooden pieces, and a stabilizer are mixed, this mixture is uniformly compacted to form the subgrade 12, and pavement is provided on the subgrade 12. The wooden pieces are included by 10-30 wt.% against the soil, and the stabilizer is included by 2-20 wt.% against the soil. The soil is collected from the land where the subgrade 12 is to be formed, and the wooden pieces are formed by cutting and crushing the trees existing on the land where the subgrade 12 is to be formed. The average diameter of the wooden pieces is 1-20 mm, and the average length of the wooden pieces is 10-200 mm. One of Portland cement, blast furnace cement, and a cement series solidifier is normally used for the stabilizer.
申请公布号 JP2002227107(A) 申请公布日期 2002.08.14
申请号 JP20010025110 申请日期 2001.02.01
申请人 NIPPON ENGINEERING CONSULTANTS CO LTD;IGARASHI TOKUSHU KENSETSU KK;TOKYO HOSO KOGYO 发明人 SASAGAWA SHIGERU;IGARASHI KUNIO;HANAKI KAZUFUMI
分类号 E01C3/00;(IPC1-7):E01C3/00 主分类号 E01C3/00
代理机构 代理人
主权项
地址