摘要 |
<p>PROBLEM TO BE SOLVED: To quantitatively evaluate a scheduling result and to optimize scheduling according to the evaluation result of the scheduling. SOLUTION: After scheduling data stored in a scheduling DB are inputted, the scheduling is carried out and the result of the scheduling is found (steps S1 and S2). Then the result of the scheduling is applied to an evaluation function to find an evaluated value (step S3). Further, it is judged whether the evaluated value is minimum (step S4) and when so, it is stored in a storage device (step S5). This processing is performed for multiple scheduling and the scheduling having the minimum evaluated value is selected (steps S6 to S8).</p> |