发明名称 EXECUTION METHOD FOR FOUNDATION OF BUILDING AND FOUNDATION OF BUILDING
摘要 PROBLEM TO BE SOLVED: To eliminate the possibilities that the low strength of a joint section between the outer periphery of dirt-floor concrete and a continuous footing makes a gap generated in the joint section in a foundation of a building constructed by a conventional execution method, that the intrusion of the moisture of ground from the gap causes a decrease in moisture resistance of a space under a floor, and that insects such as termites cause insect damage. SOLUTION: A coupling fitting 20 is buried between the outer periphery of the dirt-floor concrete 5 and the continuous footing 4 in such a manner as to lie astride both of them.
申请公布号 JP2002206244(A) 申请公布日期 2002.07.26
申请号 JP20010002909 申请日期 2001.01.10
申请人 SANYO HOMES KK;KUBOTA CORP 发明人 KON YOSHIAKI;INOUE SHUICHI
分类号 E02D27/01;E04B1/64;E04B1/72;(IPC1-7):E02D27/01 主分类号 E02D27/01
代理机构 代理人
主权项
地址