发明名称 |
EXECUTION METHOD FOR FOUNDATION OF BUILDING AND FOUNDATION OF BUILDING |
摘要 |
PROBLEM TO BE SOLVED: To eliminate the possibilities that the low strength of a joint section between the outer periphery of dirt-floor concrete and a continuous footing makes a gap generated in the joint section in a foundation of a building constructed by a conventional execution method, that the intrusion of the moisture of ground from the gap causes a decrease in moisture resistance of a space under a floor, and that insects such as termites cause insect damage. SOLUTION: A coupling fitting 20 is buried between the outer periphery of the dirt-floor concrete 5 and the continuous footing 4 in such a manner as to lie astride both of them.
|
申请公布号 |
JP2002206244(A) |
申请公布日期 |
2002.07.26 |
申请号 |
JP20010002909 |
申请日期 |
2001.01.10 |
申请人 |
SANYO HOMES KK;KUBOTA CORP |
发明人 |
KON YOSHIAKI;INOUE SHUICHI |
分类号 |
E02D27/01;E04B1/64;E04B1/72;(IPC1-7):E02D27/01 |
主分类号 |
E02D27/01 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|