摘要 |
PROBLEM TO BE SOLVED: To provide an execution method of a slab-on-earth capable of being executed within a short period of time without impairing any workability in the case of casting and controlling the occurrence of cracks over a long period. SOLUTION: A concrete is cast in an earthen floor of a building or the like, a mesh textile or a glass mat is laid thereon, it is leveled off with a trowel, and after the mesh textile or the glass mat is embedded within 15 mm from the surface of the concrete, the concrete is dried to solidify.
|