发明名称 |
METHOD OF OPERATION OF PEAK-LOAD HOT-WATER BOILER PLANT |
摘要 |
peak-load hot-water boilers; heat-power engineering. SUBSTANCE: heating-system water is heated in hot-water boiler and is directed to consumers; leakage of heating-system water is compensated for by make-up water is prepared in vacuum deaerator. Starting water is fed deaerator; make-up water before supply to heating-system pipe line and starting water before supply to vacuum deaerator are heated in succession by waste gases of hot-water boiler. EFFECT: enhanced economical efficiency. 1 dwg
|
申请公布号 |
RU2184313(C1) |
申请公布日期 |
2002.06.27 |
申请号 |
RU20000127361 |
申请日期 |
2000.10.31 |
申请人 |
UL'JANOVSKIJ GOSUDARSTVENNYJ TEKHNICHESKIJ UNIVERS |
发明人 |
SHARAPOV V.I.;ORLOV M.E.;ROTOV P.V. |
分类号 |
F22D1/00;F24H1/00;(IPC1-7):F22D1/00 |
主分类号 |
F22D1/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|