发明名称 |
SPILLING PROCESS |
摘要 |
PURPOSE: A spilling process is provided to reinforce a tunnel according to assumption conditions by applying a limit-balance analysis to obtain a desirable stability and reinforcing the tunnel satisfying the pre-determined stability. CONSTITUTION: The process comprises several steps of: obtaining a two-dimensional stability of cross-sectional side of the tunnel and a three-dimensional stability of a blind end of the tunnel required to analyze the stability of the tunnel; selecting a proper condition satisfying a pre-determined stability among both values from the first step; boring the tunnel in a direction of the blind end radiation and/or of progressing the tunnel depending on the selected condition and inserting a reinforcing material and grouting the tunnel. The first step is conduced by utilizing a display equipped with a simulation program for obtaining the two-dimensional and the three-dimensional stabilities based on at least one assumptions.
|
申请公布号 |
KR20020045055(A) |
申请公布日期 |
2002.06.19 |
申请号 |
KR20000074348 |
申请日期 |
2000.12.07 |
申请人 |
KANG, IN KYU;PENIEL ENGINEERING & CONSTRUCTION CO., LTD. |
发明人 |
KANG, IN KYU |
分类号 |
E21D9/14;(IPC1-7):E21D9/14 |
主分类号 |
E21D9/14 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|