摘要 |
PROBLEM TO BE SOLVED: To provide a foundation execution method of a building for reducing the execution time of the foundation and further, simplifying demolition work. SOLUTION: Foundation ground is excavated, footings 10A and 10B manufactured at another location are installed in eh excavated hole, and back filled to complete the foundation. In this case, the footings 10A and 10B are of a structure where the periphery of concrete 12 for burying an anchor bolt 13 is surrounded by such rigid frames 11A and 11B as a steel sheet.
|