发明名称 STRUCTURE AND DEMOLITION AND CONSTRUCTION METHOD THEREOF
摘要 PROBLEM TO BE SOLVED: To reduce shear force and bending moment operating on a pile top easily without increasing costs drastically. SOLUTION: A short pile 15 with a shorter length dimension than a foundation pile 13 is provided downward while the pile 15 projects in parallel with a foundation pile 13 on a lower surface 14a of an upper structure 14, and moreover, the pile top 15a of the short pile 15 and the lower surface 14a of the upper structure 14 are subjected to rigid connection.
申请公布号 JP2002138494(A) 申请公布日期 2002.05.14
申请号 JP20000333763 申请日期 2000.10.31
申请人 SHIMIZU CORP 发明人 MANO HIDEYUKI
分类号 E02D27/12;E02D27/28;E02D27/34;E04G23/02;E04G23/08;(IPC1-7):E02D27/12 主分类号 E02D27/12