发明名称 |
STRUCTURE OF AND CONSTRUCTION METHOD FOR UNDERGROUND CAVITY |
摘要 |
PROBLEM TO BE SOLVED: To provide a structure of and a construction method for an underground cavity that can ensure sufficient and reliable reinforcement or water sealing even if a spiral tunnel has a wide interval. SOLUTION: A cavity is constructed in the ground. A spiral tunnel is constructed about the underground cavity in an encircling relation thereto. A connecting hole is constructed from one position of the spiral tunnel to another. A reinforcement or sealant is placed into the ground from the connecting hole. The cavity is alternatively constructed after the reinforcement or sealant is placed from the connecting hole. Both are alternatively constructed simultaneously.
|
申请公布号 |
JP2002106299(A) |
申请公布日期 |
2002.04.10 |
申请号 |
JP20000300607 |
申请日期 |
2000.09.29 |
申请人 |
ENG SHINKO KYOKAI;HAZAMA GUMI LTD;DIA CONSULTANT:KK;KOMATSU LTD;TAISEI CORP |
发明人 |
AMAMIYA KENICHIRO;YOSHIMURA KAZUHIKO;KOMATA AKIRA;MITANI NORIO;KOJIMA KEIJI;KAJI OSAMU;HATA NORIO;SUGIHARA YUTAKA;KAWAKAMI JUN |
分类号 |
E02D29/045;E21D13/00;E21D13/02;(IPC1-7):E21D13/02 |
主分类号 |
E02D29/045 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|