发明名称 |
COMPACTING SAND PIPE CONSTRUCTING METHOD FOR DIRECT BEDROCK SUPPORT GROUND FOR STRUCTURE |
摘要 |
PROBLEM TO BE SOLVED: To precisely predict and confirm security of a specified sand pile compaction or N-value between sand piles when a compacting sand pile construction method for direct bedrock support ground is improved by the formation of compacting sand piles. SOLUTION: A specified sand pile compaction degree or a N-value between sand piles is secured by forming sand pile while keeping corelation P constant while making use of a corelation P constant while making use of a corelation P in the casing driving back process at the time when a compaction sand pile is constituted in the initial tangential inclination Ka of a load-settling curve of the improving ground and a non-vibration method, or corelation of the N- value between the piles in the improving ground and the compacted effect and the reaction between the compaction effect and the reaction P.
|
申请公布号 |
JP2002105945(A) |
申请公布日期 |
2002.04.10 |
申请号 |
JP20000312648 |
申请日期 |
2000.09.07 |
申请人 |
FUDO CONSTR CO LTD |
发明人 |
YAMAMOTO MINORU;NAKANO KENJI;ONISHI TOMOHARU;OTSUKA MAKOTO |
分类号 |
E02D3/10;E02D3/08;E02D27/28;(IPC1-7):E02D3/10 |
主分类号 |
E02D3/10 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|