摘要 |
PROBLEM TO BE SOLVED: To provide technique of developing a new method for forming a landscape correction face capable of reducing time and labor required for maintenance and management while maintaining landscape correction effect of the landscape correction face by plants and trees and ensuring safety in traffic. SOLUTION: In a construction method in which landscape correction is applied for construction base 10 such as exposed rock bed, mortar construction face, etc., the landscape correction employs landscape correction by plants and trees and landscape correction by removing plants and trees simultaneously, and a fixation prevention layer of plants is formed by a composite material 14 of a plant granular material and consolidation agent in the landscape correction by removing plants and trees. The whole construction base maintains greening landscape correction effect such as an effect for becoming familiar with scenery in the surroundings by the hue presented by plants and trees, and time, labor, and cost required for maintenance and management are markedly reduced because fixation and growth of plants and trees into the fixation prevention layer 15 are prevented.
|