发明名称 INSTALLATION METHOD OF BRIDGE SLAB AND PC PLATE THEREOF
摘要 PURPOSE: An installation method of a bridge slab is provided to improve work efficiency by removing the cumbersome processes of construction and reducing construction progress and to minimize accidents such as death from a fall during the construction. CONSTITUTION: The installation method of a bridge slab comprises the steps of: pre-casting a PC(precast concrete) plate(P) to be installed on a concrete beam(2) before constructing a slab; hauling and carrying the manufactured PC plate(P) by using a working chassis(10), then installing in a row by substituting for an area to install a form on the concrete beam(2) as much as the required quantity; after removing the working chassis(10), arranging reinforcing bars on the upper part of the installed PC plate(P), then placing concrete and curing a slab together with the PC plate(P).
申请公布号 KR20020023602(A) 申请公布日期 2002.03.29
申请号 KR20000056002 申请日期 2000.09.23
申请人 CHUN IL ENGINEERING CO., LTD.;KIM, MI KYUNG 发明人 KIM, MI KYUNG;KIM, YEONG GEOL
分类号 E01D1/00;(IPC1-7):E01D1/00 主分类号 E01D1/00
代理机构 代理人
主权项
地址