发明名称 VENERATION-CONSTRUCTION METHOD OF EARTH DAM
摘要 PURPOSE: A veneration-construction method of an earth dam is provided to secure the stability of a dam sufficiently, to have perfect effects of water stopping and to reduce construction expenses. CONSTITUTION: The veneration-construction method of an earth dam comprises the steps of: excavating a contact part with the water surface of the upper stream from the existing earth dam(10) to be stepped, then shotcreting to prevent the surface loss caused by rainwater; placing a plinth(18) on an appropriate part of the foundation of the dam(10) to prevent an incline from sliding down; constructing a slope(22) of a dam by hardening a rubble layer along the stepped plane(12) repeatedly; banking a top part(24) to the appointed height on the slope, then hardening; hardening the outer layer of a slope(22) from the top part(24), then shotcreting; and placing a concrete cut-off wall on the outer layer of the hardened slope(22) to standardize the slope of a dam.
申请公布号 KR20020022446(A) 申请公布日期 2002.03.27
申请号 KR20000055229 申请日期 2000.09.20
申请人 KUMHO ENGINEERING CO., LTD. 发明人 JANG, OK SEONG
分类号 E02B7/10;(IPC1-7):E02B7/10 主分类号 E02B7/10
代理机构 代理人
主权项
地址