发明名称 |
CONTINUOUS CONSTRUCTION METHOD FOR PRECAST CONCRETE COLUMN WALL MEMBER |
摘要 |
PROBLEM TO BE SOLVED: To increase the efficiency and accuracy of execution by efficiently and continuously carrying precast concrete members into a prescribed position for the purpose of subsequently assembling the members. SOLUTION: In the continuous construction method for the precast concrete column wall member, column blocks 10 are carried into an earth retaining space 5 formed by ground excavation and longitudinally coupled together on foundation concrete 11, and column walls 3 composed of plural lines are constructed within the space 5. The column block 10 has an inverted T-shaped cross section with a base. Bearing balls 14 are spread for placement all over the top surface of a rail 13 wherein the base is laid on the foundation concrete 11 for the purpose of horizontally pulling the column blocks 10. The column blocks 10 are moved to a coupling position with the rolling motion of the bearing balls 14 and sequentially coupled together in the above position in order to construct the integrated column walls 3.
|
申请公布号 |
JP2002088785(A) |
申请公布日期 |
2002.03.27 |
申请号 |
JP20000276358 |
申请日期 |
2000.09.12 |
申请人 |
ANDO CORP;GEOSTR CORP |
发明人 |
NONODA YOSHINARI;SAWADA MASAHIRO;SO RYUSUKE;YONEDA TOKIHIKO;ICHIKAWA JUNICHI;ODAKA TAKESHI;UNNO YUSUKE |
分类号 |
E02D29/00;E02D5/10;E02D29/045;E03F1/00;E04G21/14;E21D13/00;(IPC1-7):E02D29/045 |
主分类号 |
E02D29/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|