摘要 |
A wind power installation is disclosed comprising a rotor having at least one rotor blade for converting the kinetic energy of the wind into mechanical energy, an adjusting device for individually adjusting at least one rotor blade, a generator for converting the mechanical energy of the rotor into electrical energy, and an operative connection between the rotor and the generator for transmitting the mechanical energy of the rotor to the generator. The disclosed wind power installation therefore avoids specified problems of known installations and provides a wind power installation in which the loadings which can occur due to local, temporary peaks in the wind speed in portions of the rotor area are reduced. Accordingly, in the disclosed wind power installation, there is provided a measuring device which ascertains the instantaneous loading of a part of the wind power installation, a control device which ascertains a position of at least one rotor blade that is desired for the instantaneous loading, and suitably adjust the rotor blade by the adjusting device, and a connecting device which connects the adjusting device and the measuring device to the control device.
|