PROBLEM TO BE SOLVED: To complete the work in a short period of time from the beginning to the end of the temporary flashing work for a wooden building. SOLUTION: This construction method comprises a first process in which through-columns 12 are erected on a foundation and a first floor horizontal member 13 is attached to the middle portion of the through-columns 12, a second process in which second floor panels 14 are attached to the plane of structure surrounded by the first floor horizontal members 13, a third process in which roof trusses 17 are installed to the upper end side of the through-columns 12, and a fourth process in which the roof panels 18 are attached to roof trusses 17.
|