发明名称 TEXTILE PRODUCTION METHOD, AND ITS PRODUCTION PLAN METHOD
摘要 PROBLEM TO BE SOLVED: To realize a short delivery period in normal production method, concerning a production method, and to provide a production plan method for textile. SOLUTION: For twist yarn production, which occupies a quarter of textile production period, the storing of twisted yarn is performed in advance by estimated production to omit the process. Next, the regular production period is shortened, by performing the production of textile in parallel by means of a plurality of looms. Hereby, in a normal textile production process, short-period production is also made possible. Moreover, stored twisted yarns, necessary for production of ordered textile, is searched for and looms for parallel production are reserved, so that in an usual textile production process, a short-term production plan can be materialized. Moreover, the half-finished stock in a dyeing plant is reduced, and the appointed date of delivery after the completion of dyeing process can be put forward.
申请公布号 JP2002078395(A) 申请公布日期 2002.03.15
申请号 JP20000262077 申请日期 2000.08.31
申请人 TEIJIN LTD 发明人 HIROTA MASASHI;HORIO TOMOYUKI;OSAGAWA KENICHI;TANAKA YASUHIRO
分类号 主分类号
代理机构 代理人
主权项
地址