发明名称 CONSTRUCTION METHOD FOR STEEL PIPE COLUMN, AND PILE HEAD PROCESSING CONSTRUCTION METHOD TO CAST-IN-PLACE PILE FOR SAME METHOD
摘要 PROBLEM TO BE SOLVED: To provide a steel pipe column construction method for correctly constructing a steel pipe column such as a concrete-filled steel pipe column on a pile head top surface of a cast-in-place pile with a weld reinforcement part eliminated by a simple means. SOLUTION: A cut hole H1 for an anchor is formed in a pile head top surface T of the cast-in-place pile C from which the weld reinforcement part C1 is eliminated at a center position where a steel pipe column 11 is to be constructed, an anchor 10 in which an adjusting plate 9 is height-adjustably disposed is installed in the cut hole H1 for an anchor, and a pile center guiding member 13 is disposed through an end plate 12 to a center position at a lower end in the steel pipe column 11. The column 11 is suspended down from above while adjusting its center position by the anchor 10 and the pile center guiding member 13 till the steel pipe column 11 is placed on the adjusting plate 9 through the end plate 12. Adjusters 8 to adjust an interval between the steel pipe column 11 and a pile head steel pipe l for adjusting verticalness of the steel pipe column 11 are disposed at plural positions at an upper end part of the pile head steel pipe 1.
申请公布号 JP2002061198(A) 申请公布日期 2002.02.28
申请号 JP20000249366 申请日期 2000.08.21
申请人 RAILWAY TECHNICAL RES INST;KONOIKE CONSTR LTD;SUMITOMO METAL IND LTD 发明人 WAKUI HAJIME;MATSUMOTO NOBUYUKI;WAKABAYASHI KENICHI;SOTOZONO SHINJI;IZAWA MAMORU;KANEKO ETSUZO
分类号 E02D5/34;E02D27/00;E02D27/12;E04B1/24;E04B1/30;E04B1/58;(IPC1-7):E02D27/00 主分类号 E02D5/34
代理机构 代理人
主权项
地址