发明名称 WORK EXECUTION METHOD OF VERTICAL PIPE FOR MULTISTORY BUILDING
摘要 PROBLEM TO BE SOLVED: To provide a method that enables work execution with the least possible labor. SOLUTION: In carrying out work execution of a vertical pipe 2 through series joining of two or more pipe materials 10 in a multistory building 1, the first pipe material 10 is hoisted from the top of the building 1 into a substantially vertical position by the deadweight. The second pipe material 10 laid in the lower floor with its upper end turnably attached to the lower end of the first pipe material 10 in the vertical position is next hoisted subsequently to the first pipe material 10 until brought in a substantially vertical position by the deadweight, so that the first pipe material 10 and the second pipe material 10 are substantially in a straight line. A process of fixing the upper end of the second pipe material 10 to the lower end of the first pipe material 10 in the state in the substantially straight line is appropriately repeated to join two or more pipe materials 10 in series and thus arrange the vertical pipe 2.
申请公布号 JP2002061772(A) 申请公布日期 2002.02.28
申请号 JP20000249808 申请日期 2000.08.21
申请人 TAKASAGO THERMAL ENG CO LTD;MAEDA CORP 发明人 NAKAGAKI TAKASHI;HASEGAWA MASARU;KUROTORI KOICHI
分类号 F16L1/00;(IPC1-7):F16L1/00 主分类号 F16L1/00
代理机构 代理人
主权项
地址