摘要 |
For tightness testers with a plurality of in-line test stations (1) on a conveyor it is proposed to supply the tightness-relevant measurement signals from the chambers by detecting pressure change measurements via pressure sensors or electrical impedance measurements via electrodes that occur at the test stations over a time interval. The signals are supplied through multiplexers (5) to a central evaluation (9).
|