摘要 |
PROBLEM TO BE SOLVED: To perform the schedule management with high efficiency even when a single job is divided into pieces and ordered. SOLUTION: This schedule management system includes a work schedule table where a schedule manager can communicate with a managed person via a network and which is placed at the side of the manager and stores the schedules produced by the manager, a common schedule table which is available on a network, a transfer means which transfers the schedules stored in the work schedule table to the common schedule table and a schedule reference means which is placed at the side of the managed person and can refer to the schedules stored in the common schedule table. Thus, both managed person and manager refer to the same schedules for producing a schedule of high accuracy. The managed person can easily transmit the result data and the manager can accurately reflect the actual results in the schedule. |