发明名称 METHOD FOR CONSTRUCTING STEEL PIPE REINFORCED SOIL CEMENT PILE
摘要 PROBLEM TO BE SOLVED: To avoid discharge of soil containing a hardener when a steel pipe reinforced soil cement pile comprised of a steel pipe and soil cement is constructed. SOLUTION: There is provided an excavating rod 1 which has at least an excavating/agitating blade 5 and an agitating blade 3 at its tip, has a lower exhaust port 7 and an upper exhaust port formed in a portion near the tip and a portion near the agitating blade 3, respectively, and includes a spiral screw 4 arranged above the agitating blade 3. During driving of the excavating rod 1, when the lower exhaust port 7 reaches a depth which is above a location where the upper exhaust port 8 reaches when the excavating rod 1 lowers to an undermost location, soil cement construction is started while a hardening solution is injected from the lower exhaust port 7.
申请公布号 JP2002021072(A) 申请公布日期 2002.01.23
申请号 JP20000211542 申请日期 2000.07.12
申请人 TENOX CORP;NIPPON STEEL CORP;KUBOTA CORP 发明人 YOSHIDA SHIGERU;HORIKIRI SETSU;NAKAJIMA MICHIO;SAWAISHI MASAMICHI;OTSUKI MITSUGI
分类号 E02D5/46;E02D5/56;(IPC1-7):E02D5/46 主分类号 E02D5/46
代理机构 代理人
主权项
地址