发明名称 Method to replace esp. railway bridge with new bridge erected on newly constructed foundations while old bridge is till in situ, and without temporary bridge
摘要 A new bridge is supported on newly constructed foundations, put in place while the old bridge is still in situ. The old bridge is removed and the new bridge is put in its place without the use of a temporary bridge, and by blocking the traffic once only. The bridge (1) has supports (5), esp. horizontal stringers (7), which consist of esp. pre-fabricated steel sections, and are imbedded into cast concrete (15). The stringers are defined by chamber walls (11) of pre-fabricated concrete parts, which form an integral unit with the cast material. The stringers are supported on steel foundations (6).
申请公布号 DE10032448(A1) 申请公布日期 2002.01.17
申请号 DE20001032448 申请日期 2000.07.04
申请人 TILEBEIN, HEIKO 发明人 TILEBEIN, HEIKO
分类号 E01D22/00;(IPC1-7):E01D22/00 主分类号 E01D22/00
代理机构 代理人
主权项
地址