摘要 |
<p>PROBLEM TO BE SOLVED: To solve the problem that it is necessary to update the number of MAXSTEP indicating a transition timing to the next processing each time the cycle of an output signal is changed for switching processing based on the result of the comparison of the number of steps of a master clock being the reference of a processing operation with the number of the MAXSTEP in a conventional signal processor, and that it is difficult to execute the update processing. SOLUTION: A signal processor 1 compares the number of steps of a clock for an output signal for deciding the cycle of output processing with the prescribed number of MAXSTEP by a comparator 3, and switches the processing of an extension processor 2 based on the compared result.</p> |