发明名称 CONTROL CIRCUIT FOR HYDRAULIC BACKHOE
摘要 PROBLEM TO BE SOLVED: To sufficiently ensure pressure oil required for boom lifting and improve boom lifting even in the case of the simultaneous operation of bucket closing, arm closing and boom lifting, and to enhance workability. SOLUTION: In a hydraulic circuit composed of the first hydraulic circuit, which contains each direction control valve in boom two-speed, slewing and arm one-speed and in which the direction control valves are connected in parallel respectively, and the second hydraulic circuit, which comprises each direction control valve in boom one-speed, a bucket and arm two-speed and in which the direction control valves are connected in parallel respectively, slewing variable priority circuits are installed in the downstream of the direction control valves for slewing in parallel oil passages for the first hydraulic circuit, one pilot control sections of the slewing variable priority valves are communicated with pilot valves for slewing, and the other pilot control sections of the priority valves are communicated with pilot valves for a boom through direction changeover valves changed over at pilot pressure from pilot valves for the bucket.
申请公布号 JP2002004339(A) 申请公布日期 2002.01.09
申请号 JP20000188353 申请日期 2000.06.22
申请人 SUMITOMO (SHI) CONSTRUCTION MACHINERY MANUFACTURING CO LTD 发明人 TSUKAMOTO HIROYUKI
分类号 E02F9/22;F15B11/16;(IPC1-7):E02F9/22 主分类号 E02F9/22
代理机构 代理人
主权项
地址