发明名称 |
CONSTRUCTION METHOD AT EMBANKMENT INSTALLATION OF HOLLOW STRUCTURE |
摘要 |
PROBLEM TO BE SOLVED: To provide a construction method at embankment installation of a hollow structure for embanking at least a specified level without the need for increasing thickness of a component member of the hollow structure. SOLUTION: A plurality of bank layers 6 are separately embanked step-by- step, and a plurality of anchor bolts 7 protrude at least an upper wall part 3 of a hollow structure 1. The anchor bolts 7 are sequentially extended at embankment of stepwise bank layers 6. The load of embankment applied on the hollow structure 1 is supported with the anchor bolts 7, so the loads applied on both side wall part 2 and the upper wall part 3 of the hollow structure 1 are reduced even with a thicker embankment on the hollow structure 1.
|
申请公布号 |
JP2002004304(A) |
申请公布日期 |
2002.01.09 |
申请号 |
JP20000181783 |
申请日期 |
2000.06.16 |
申请人 |
NIPPON ZENITH PIPE CO LTD;NIPPON HUME CORP;GEOSTR CORP;MATIERE MARCEL |
发明人 |
IWASAKI TAKAO;YAMASHITA KIICHI;KONO SADAMU;KAWAMURA JUNICHI;KIYOHARA KATSUJI;YAMAMOTO HIROSHI |
分类号 |
E21D20/00;E02D17/18;E02D29/045;(IPC1-7):E02D29/045 |
主分类号 |
E21D20/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|